Read the plan
FFEs, driveway slope, and where the septic or utilities land change how we cut the lot.

House pad and building pad dirt work — from raw lot to a pad the builder can stake, with stripping, grading, and compaction in the right order.
Site prep is the unglamorous work that keeps a house from cracking and a shop from ponding. We strip organics, set subgrade, place fill in lifts, and leave a house pad or building pad that matches the engineer’s numbers when you have them — or a practical field grade when you do not.

FFEs, driveway slope, and where the septic or utilities land change how we cut the lot.
Strip, fill, compact. Clay in North Texas does not forgive a rushed lift.
A site the next trade can occupy without re-grading our work.
Same work, different ground. Open the city that matches the lot.
Excavation & Dirt Work — Skid steer and excavator dirt work — cut, fill, haul-off, and structural digging for homes, barns, and pads across North Texas clay.
Land & Lot Clearing — Lot clearing and fence line clearing — brush, mesquite, cedar, and scrap piles off so survey, utilities, and pad work can start.
Grading & Finish Grade — Rough grade for drainage, finish grade for sod and slab — slopes that send water away from the house.
Drainage & French Drains — Yard won’t drain? French drains, catch basins, and regrade for clay lots with standing water against the house.